ILF Consulting Engineers has signed a contract with GAZ-SYSTEM S.A. for the preparation of the design documentation for a high-pressure gas pipeline from Lwówek to Odolanów (DN1000, MOP 8.4 MPa, length: 165 km). The scope of...[more]


ILF Consulting Engineers has been commissioned to conduct a feasibility study for the National Project "LNG Ukraine – Establishment of the Infrastructure for the Liquefied Natural Gas Supply to Ukraine". The project...[more]


ILF will take part in the "International trade fair for alpine technologies" (Interalpin) from 10 to 12 April 2013 in Innsbruck.To learn about our competence and experience in the area of ski resort planning, come and...[more]


ILF Consulting Engineers will again participate in Europe’s leading conference on new pipeline technologies with several presentations and our own stand. We are very pleased to welcome you at the Hannover Congress Centrum from 18...[more]


The Ministry of Petroleum and Mining of the Republic of South Sudan awarded the contract for a study investigating the various possibilities of exporting oil to ILF Consulting Engineers. In the framework of this study the...[more]


NABUCCO Gas Pipeline Int. (NIC) entrusted SAIPEM with the execution of the technical preliminary design (Front End Engineering & Design - FEED) for the Nabucco West project. ILF Consulting Engineers will support SAIPEM in...[more]


On 14 January 2013 the Czech pipeline company NET4GAS s.r.o. held the grand opening ceremony for the 166-km-long 56” ‘Gazelle’ gas transit pipeline. This pipeline transports Nord Stream gas to Southern Germany. The pipeline has...[more]


ILF Consulting Engineers was awarded by Erbud S.A. with  the preparation of design documentation for the solid waste incineration plant in Konin. The scope of services includes the conceptual design, building permit design...[more]


We thank our friends and business partners for the pleasant cooperation in 2012 and are sending seasons greetings together with our best wishes for a happy and prosperous new year!We have renounced the idea of Christmas gifts in...[more]


On 14 December 2012 a consortium with  ILF Consulting Engineers, as the leading member, signed a contract for consultancy and construction supervision services for the Jaggran II hydro power project (48 MW) in Pakistan. The...[more]


In October 2012 ILF Consulting Engineers was commissioned by Vorarlberger Illwerke AG to carry out the design services for the general rehabilitation of the lower stage of the Gampadels hydropower plant. The power plant, with an...[more]


In October 2012 Airport Consulting Partners was awarded a contract to refurbish three airports in Turkmenistan by the „Turkmenhowayollary - State Civil Aviation Department”. The airports in Turkmenabat and Daşoguz as well as the...[more]


Interested in new trends and developments in the fields of instrumentation and control?Then be invited to participate in our Instrumentation & Control Focus Day on November 28, 2012 in Abu Dhabi, UAE.Experts from ILF...[more]


On 04 October 2012 ebswien hauptkläranlage Ges.m.b.H commissioned ILF Consulting Engineers, as the partner of an association of consulting engineers, to provide the overall design works for implementing the project “EOS –...[more]


On 26.09.2012, an international consortium consisting of ILF Consulting Engineers and other partners was commissioned by the Ministry of Transport of the Republic of Uganda to perform design services for the ”Standard Gauge...[more]


Together with a partner company, ILF Consulting Engineers was commissioned by ASFINAG Service GmbH to provide the site supervision services for the second tube of the Gleinalm tunnel on the A9 Pyhrn motorway.The project...[more]


In the summer of  2012, ILF Consulting Engineers (together with partners) was commissioned by  ÖBB (Austrian Federal Railways) to provide the tender and construction design for the approx. 9.5 km long railway section...[more]


ILF Consulting Engineers signed a contract for the preparation of a feasibility study for a gas link between the gas grids of Lithuania and Poland. The link, with a planned length of approx. 562 km, will integrate the Baltic...[more]


On 25 June 2012 the second tube of the Pfänder tunnel on the A14 Rheintal motorway in Bregenz (Austria) was officially opened to traffic. The approx. 7 km long motorway tunnel complies with the latest technical standards and most...[more]


On 22 June 2012 ILF Consulting Engineers signed a contract with PGE Górnictwo i Energetyka Konwencjonalna S.A. for the preliminary design of a CO2 transportation pipeline. The project is executed in relation to the construction...[more]


On 22 June 2012, Metro Warszawskie determined the result of the competition for the preparation of the architectural and building concept design of the Warsaw metro line II development. ILF Consulting Engineers submitted the best...[more]


ILF is very pleased to welcome its clients at the INTERSOLAR EUROPE 2012, the world´s largest exhibition for the solar industry. Visit us from 13 to 15 June 2012 in hall B5, stand B5.356 at the New Munich Trade Fair Centre.For...[more]


At the end of April 2012, the “Public Enterprise Macedonian Railway Infrastructure” commissioned ILF in association with partners to perform design services for the Kumanovo – Beljakovce section of the Trans-European Rail network...[more]


On 10.05.2012, ILF signed three agreements with GAZ-SYSTEM S.A. for the execution of designer supervision services during the construction of the transit gas pipelines:1.    Rembelszczyzna – Gustorzyn gas pipeline...[more]


On 29 March 2012, the Dutch energy company ENECO officially started operation of its first gas storage facility, the ENECO Gas Storage Epe.The installation has an injection capacity of 200,000 Nm³/hour and a withdrawal capacity...[more]


Project is not affected by the international sanctions against Iran[more]


ILF Consulting Engineers successfully completed two Brownfield Re-Engineering Conceptual Design Projects for TNK-BP-owned giant Samotlor oil field and 5 adjacent smaller fields in Western Siberia. In total 28 field operation...[more]


Being the lead partner of a three-party consortium, ILF will supervise construction works in 17 communities in Georgia on behalf of the Municipal Development Fund of Georgia. The total investment of approximately 25 million EUR...[more]


At the end of February 2012, the Dubai Electricity and Water Authority (DEWA) awarded ILF Consulting Engineers (ILF) the contract to design the Mohammed bin Rashid Al Maktoum Solar Park. In this project, both Concentrated Solar...[more]


On 01 February 2012, PCC Rokita S.A. selected ILF Consulting Engineers as Technical Advisor and Owner’s Engineer for the construction of a Combined Cycle Combined Heat and Power Plant in Brzeg Dolny in Poland. The new gas turbine...[more]


ILF will again participate in Europe´s leading conference for new pipeline technologies with presentations and its own stand.  We are very pleased to welcome you in Hannover from 28 to 30 March 2012. For further information...[more]


On 01 Feb 2012, ILF Consulting Engineers signed an Owner’s Engineer contract for the erection of a 1000 MWe-class coal-fired supercritical unit at Ostroleka C Power Plant. The client is Elektrownia Ostrołęka S.A., a member of the...[more]


ILF is looking forward to welcoming its clients at the E-world 2012, Europe’s largest exhibition for energy. Visit us from 7 to 9 February 2012 in Hall 7 / Stand 7-509.For further information please visit the webiste...[more]


ILF Consulting Engineers (as part of a consortium under the lead of Pöyry) has been awarded a contract to provide services for the design, preparation of tender documents and site supervision of Line 2 of the Ho Chi Minh City...[more]


On 01.12.2011 the Bunde-Etzel gas pipeline went into operation. This pipeline (length 60.4 km, DN 48”, MOP 95barg) connects the Dutch gas hub of Oude Statenzij with the cavern storage facilities in Etzel. In this project ILF...[more]


ILF has been awarded a contract for site supervision of the construction of a natural gas pipeline between Rembelszczyzna and Gustorzyn. The gas pipeline has an overall length of approx. 175 km (DN700, maximum operating pressure...[more]


A consortium under the lead of ILF Consulting Engineers has been awarded a contract by the Central Finance & Contracts Unit (CFCU) for supervision services for  the rehabilitation of the railway line Köseköy – Gebze...[more]


The breakthrough of the New Kaiser Wilhelm Tunnel was celebrated on 7 November 2011 in Cochem after a construction time of approx. 18 months.With an overall investment of 200 million euros and a length of 4,242 m the New Kaiser...[more]


After 5 years of construction, the Limberg II pumped storage power plant in Kaprun now finally comes on line. The pump and turbine output of 480 megawatt covers 10 % of the needed peak current in Austria. Limberg II is using the...[more]


These days ILF Consulting Engineers celebrates its 30 years of continued presence in Nigeria. ILF Engineers Nigeria Ltd, with its offices in Abuja and Lagos (as well as a representative office in Ghana) ranks among the leading...[more]


On 11 Aug 2011 the final breakthrough of the second tube of the Bosruck tunnel took place in an official ceremony after a construction period of only 17 months. The excavation was effected under the most difficult geological...[more]


After the successful completion of the route selection procedure, ILF and a partner office have now also been commissioned by ÖBB Infrastruktur AG to undertake the railway engineering permit application design and the compilation...[more]


After many successful years in the Hainburger Straße 31/2, the ILF Vienna office is moving to Würtzlerstraße 3/71030 ViennaTown Town on 01 August 2011. We will of course try to be available all throughout the moving...[more]


In June 2011, Gasunie (Groningen) and ILF Consulting Engineers signed a framework agreement for EPCM services for compressor stations in northern Germany. ILF has been working hard on the design for the stations ever since...[more]


In May 2011, ILF was awarded the contract to prepare the permit application design and the detailed design for the 110-km-long Styrian section of the “Südschiene” high-pressure natural gas pipeline. This pipeline section running...[more]


ILF Consulting Engineers in Poland has seen a remarkable development in the last 13 years. ILF Consulting Engineers Polska Sp. z o.o. ranks among the leading design and consulting offices in Poland and covers the whole service...[more]


ILF was assigned by ASFINAG with the detailed design for the rehabilitation of the approx. 8-km-long Karawanken tunnel on the A11 motorway between Austria and Slovenia. The scope of services includes the ventilation system, the...[more]


ILF is very pleased to welcome its clients at the INTERSOLAR EUROPE 2011, the world´s largest exhibition for the solar industry. Visit us from 8 to 10 June 2011 in hall B6, stand B6.370 at the New Munich Trade Fair Centre. For...[more]


On May 13, 2011, after several years of intensive work, the 150 m long shield machine ‘Big Becky’ completed the breakthrough of the 10.2 km long Niagara Tunnel with a diameter of 14.4 m. The euphoric workmen as well as the...[more]


ILF Consulting Engineers won the ÖBB contract for the railway detailed design for the Linz – St.Georgen/Gusen section, and thus joins in on the design of the Summerau railway line. The project comprises the upgrade of the line...[more]


ILF will take part in the "International trade fair for alpine technologies" (Interalpin) from 4 to 6 May 2011 in Innsbruck. To learn about our competence and experience in the area of ski resort planning, come and visit us at...[more]


ILF will again take part in this years Pipeline Technology Conference held in Hannover from April 4th - 5th, 2011, where our engineers will be giving several speeches to share their experience and knowhow.We are looking forward...[more]


Almost 100 years after the last major new railways were built, Norway wants to connect the larger cities by rail with a high-speed railway network according to the national transport plan 2012. In cooperation with a Norwegian...[more]


Being the lead firm of a consortium, ILF signed a contract on water loss reduction in Zarqa, Jordan, in January 2011. The project is financed by the European Commission and aims to improve the water supply system by focusing on...[more]


In late December 2010, a bidding consortium, headed by ILF, was commissioned by Schluchseewerk AG to provide the engineering services for the Atdorf pumped storage power plant in Baden-Württemberg, Germany. The new hydropower...[more]


After finishing the renovation works, the Arlberg railway tunnel was solemnly opened for normal operation on 9 December 2010. Apart from the Arlberg road tunnel, this approx. 10.65 km railway tunnel is the only direct connection...[more]


STEG Energies Renouvelables has selected ILF as partner for the implementation of an Integrated Solar Combined Cycle (ISCC) power plant project in El Borma, South Tunisia. ILF will conduct the conceptual design study to select...[more]


ILF is constantly working on respecting the environment and saving energy when it comes to projects and the company itself. This commitment was recently honoured with a price at the "Büro & Umwelt 2010" competition which...[more]


At the end of October, the ÖBB Infrastruktur AG awarded a bidder consortium led by ILF Consulting Engineers the contract for the construction supervision of the lot "KAT2" of the Koralm tunnel. This construction lot comprises two...[more]


After over three years of construction, the bypass for Heiterwang was opened on the 27 October 2010 relieving the municipality of the through traffic. The project comprises a bypass road with two directional lanes with an overall...[more]


ILF Consulting Engineers joined the international industry initiative Dii as associated partner supporting the primary goal of the industry initiative to form partnerships with governments and companies from North Africa, the...[more]


In August 2010, ILF Consulting Engineers was awarded the EPCm Framework Agreement for compression stations of Gasunie in Northern Germany. The contract was won in course of a European Tender Procedure.Gasunie intends to build 6...[more]


In August 2010, ILF Beratende Ingenieure was awarded the design of two sections of the Nabucco Gas Pipeline in Turkey in the course of an international tender procedure. On behalf of the NABUCCO Gas Pipeline International GmbH...[more]


From 22-23. September, the 8th ICOLD European Club Symposium will take place in Innsbruck/Austria. ILF will participate in this symposium with a key-note speak "A State of the Art Review on Design and Surveillance Practice...[more]


The Shuqaiq II Independent Water & Power Project in Saudi Arabia commenced production at the end of May 2010. The SR 7.2 billion (US$ 1.9 billion) project is currently producing 212,000 m³/d of water from its seawater...[more]


The joint stock company Caspian Pipeline Consortium is developing the Caspian Pipeline Expansion Project. The CPC crude oil pipeline system comprises a complete unitary pipeline system, approximately 1500 km in length,...[more]


After several years of designing, the selection of the railway alignment for the new Unterinntal valley railway line between Schaftenau and Kundl (approx. 22 km, twin tracks, 250 km/h) was completed. Special focus was put on the...[more]


The Deutsche Bahn AG commissioned ILF to perform the construction supervision for the structural works of the tunnel in the project section 1.2 and 1.6a of the Stuttgart 21 project. The project comprises the overall...[more]


ÖBB Infrastruktur AG commissioned ILF to undertake the construction supervision of the cabling and 50 Hz power supply systems for the railway line between Kundl/Radfeld and Baumkirchen. Of this 41-km-long section of the Brenner...[more]


After two years, the preliminary design phase for the major project in Bulgaria concerning the modernization of the 270 km long railway line between Vidin and Sofia (part of the Trans-European Network No.22) was completed in...[more]


The Mexico City authorities awarded ILF (as part of an international consortium) the contract for the assessment and certification of the operational safety of all electromechanical facilities for the Metro Line 12. In addition,...[more]


The water supply for the emirate of Abu Dhabi is based to a large extent on desalinated sea water; only a small part is obtained from groundwater. The rapid development of the emirate led to a continuing increase in the demand...[more]


Following the successful revamping of Berth A at the Leixões Marine Loading Terminal in Oporto, Portugal, for GALP Energia during October 2008, the ILF team handed the Berth C over to GALP Energia on Wednesday the 12th of August...[more]


Petrom, a member of the OMV Group, recently started to export oil from the Komsomolskoe field located on the Caspian Sea in western Kazakhstan. ILF has been actively involved in this challenging project since ILF was assigned to...[more]


The water transmission system for Riyadh is one of the largest of its kind worldwide. A new transmission system will add to the existing Lines A+B and Line C. The new transmission system "Ras Alzaur-Riyadh" consists of one...[more]


SONATRACH TRC, the pipeline operating branch of SONATRACH, intends to revamp the metering system of all oil, gas, condensate, and LPG pipelines and substations network infrastructure. The standards to be developed in this project...[more]


In March 2009, the Agency for State Roads of the Republic of Macedonia commissioned ILF (in a joint venture) to carry out the design (from the preliminary design to the detailed design) of the new motorway section with a length...[more]


On 20th March 2009, the first sod was turned on the site of the Koralm Tunnel. The Koralm Tunnel with a length of approximately 33km is the centrepiece of the Koralmbahn double-track railway line between Graz and Klagenfurt. In a...[more]


After meeting serious challenges during the construction phase, the shield machine "Simone" broke through the Raingruben Tunnel on March 11th 2009. Altogether, the excavation works of the three tunnels (Stierschweiffeld,...[more]


Every year, companies which have reached outstanding achievements in different fields of the water industry are honoured with the GLOBAL WATER AWARD. For the Global Water Award 2009, ILF is one of the four companies which are...[more]


After nearly 23 months of intensive construction works, the time has come. On March 3rd 2009 at 5:40 pm, the breakthrough of the New Schluechterner Tunnel (3,995 m) on the Fulda - Frankfurt/Main railway line took place. The...[more]


It greatly saddens us to have to announce the sudden death of our employee and colleague Michael Antretter. He died on 24 February 2009 in an avalanche accident. Our heartfelt condolences go out to his family and friends. On...[more]


The Gazelle gas pipeline shall serve to improve the capacities of the gas transit of the already existing gas pipeline network in the Czech Republic. The tie-in of Russian natural gas, delivered by the Baltic Sea tie-in (OPAL),...[more]


Bank National d'Algerie (BNA) has appointed ILF Consulting Engineers as their Independent Engineer for the implementation of the world largest seawater reverse osmosis desalination plant Magtaa with a desalination capacity of...[more]


The Irmak - Karabük - Zonguldak railway line is connecting the Junction Station Irmak, which is located close to Ankara, with the important Black Sea harbour Zonguldak in the north. In December 2008 ILF in association with a...[more]


The Trans Balkan Pipeline Company, a consortium of Russian, Bulgarian and Greek companies awarded ILF with the design of the Trans-Balkan Pipeline. The pipeline which is around 300 kilometers in length leads from the Bulgarian...[more]


In November 2008, ILF was assigned a contract for the preparation of a feasibility study regarding the Eskene-Kuryk Crude Oil Pipeline (EKP) on behalf of the KazTransOil and in cooperation with the Kashagan consortium (ENI, Exxon...[more]


The 48-inch gas pipeline project Bunde-Etzel with an intended capacity of 4.5 Mio Nm³/h ranks among one of Europes major gas pipeline projects. The pipeline, operable in both flow directions, is designed to connect the cavern...[more]


Rudolf PöttlerPriv. Doz. Dr. habil. DI  "The Lord has given him the talent and inspiration to be creative-His journey has now come to an end"May the light of the Lord shine upon him."  In the midst of a very...[more]


The Wattenspapier paper mill has entrusted ILF with the project design of their new production halls at the companys headquarters in Wattens, Austria. Following the demolition of the existing units, two new three-storey...[more]


Its done. On October 31, 2008, the tunnel boring machine "Leonie" broke through the last concrete sealing block under huge public attention in the underground station of the Hauptbahnhof station in Leipzig. The City Tunnel of...[more]


The Central Wastewater Treatment Plant in Prague is located on the Cisarsky Island treats approx. 95 % of the wastewater generated in the Czech capital. The existing plant is in good operational order; however, it does not comply...[more]


The construction works on the 380 kilometre crude oil pipeline between Habshan and Fujairah have been started in the United Arab Emirates. The pipeline with a 48 inch diameter consists of a main pump station, a booster station...[more]


In April 2007, RWE entrusted ILF with the engineering services for the upgrading of the Compressor Station Hünxe which is part of the RWE Westfalen-Weser-EMS AG gas transport network covering a length of approx. 4,000 km. The...[more]


The EU member state Portugal accelerates the upgrading and extension of its harbour connections to establish the country as the Atlantic Gateway to the European Economic Area. Since October 2006, ILF has been preparing the design...[more]


In order to enhance the rail links between Vienna/Austria and Bratislava/Slovakia, ILF - in cooperation with a partner office - has been entrusted with the preparation of an environmental impact assessment and the railway...[more]


Since 1998, ILF has been working on behalf of the Water Supply und Sewerage Enterprise of Korça to improve the existing water supply and sewerage infrastructure of Korça, a city with a population of 85.000 located in...[more]


ILF has been awarded a contract for the design and construction supervision for the Al Wathba (near Abu Dhabi) to Al Ain Water Transmission System. The system covering a length of 160 km is designed to carry 395.000 m³/d of...[more]


Since 2006, ILF has been providing preliminary studies and authority engineering on behalf of Kharafi National for the waste water treatment plants "Wathba» (300,000 m³ sewage/d) and "Saad» (80,000 m³ sewage/d) in Abu Dhabi...[more]


The Shuweihat Water Transmission System carries potable water from the desalination plant located at Shuweihat in the West of the Emirate of Abu Dhabi to Mirfa (97 km), Sila (100 km), and Jebel Dhana and further to Abu Dhabi. In...[more]