“Südschiene 3” high-pressure natural gas pipeline - Styrian section
In May 2011, ILF was awarded the contract to prepare the permit application design and the detailed design for the 110-km-long Styrian section of the “Südschiene” high-pressure natural gas pipeline. This pipeline section running from Bruck/Laming to the delivery point at the state border with Carinthia will be projected with a diameter of DN 500 (partly DN 600) and a design pressure of 70 bar.
