Rembelszczyzna – Gustorzyn gas pipeline, Poland
ILF has been awarded a contract for site supervision of the construction of a natural gas pipeline between Rembelszczyzna and Gustorzyn. The gas pipeline has an overall length of approx. 175 km (DN700, maximum operating pressure of 8.4 MPa).
The client is Gaz-System, an operator of gas transmission pipelines in Poland.
