Rembelszczyzna – Gustorzyn gas pipeline, Poland

ILF has been awarded a contract for site supervision of the construction of a natural gas pipeline between Rembelszczyzna and Gustorzyn. The gas pipeline has an overall length of approx. 175 km (DN700, maximum operating pressure of 8.4 MPa). 

The client is Gaz-System, an operator of gas transmission pipelines in Poland.

Change to German