Gas Link between Poland and Lithuania
ILF Consulting Engineers signed a contract for the preparation of a feasibility study for a gas link between the gas grids of Lithuania and Poland. The link, with a planned length of approx. 562 km, will integrate the Baltic countries with the gas market of the European Union and will provide access to the liquefied natural gas market through the LNG terminal in Świnoujście. The project is carried out for GAZ-SYSTEM S.A. and Lietuvos Dujos.
Change to German