Choose a language

References:             

Reference list (excerpt)

Trans Adriatic Pipeline (TAP)

Project 

   

Trans Adriatic Pipeline (TAP) - FEED

Client

   

Trans Adriatic Pipeline AG (TAP)

Country

   

Greece, Albania, Italy

Time frame

   

2008 -

The Trans Adriatic Pipeline is a pipeline system of natural gas from Greece via Albania and the Adriatic Sea to Italy. Starting point is Thessaloniki/Greece, termination point is Brindisi/Italy.

Technical Data:

  • Initial throughput: 10 BCM/a, final: 20 BCM/a
  • Length onshore pipeline: 390 km, diameter: 48"
  • Length offshore pipeline: 130 km, diameter: 36"
  • 3 compressor stations

Scope of work:

  • Project management
  • Route optimisation off- and onshore as well as detailed clarification concerning the shore approach zone in Italy and Albania
  • Route selection in Albania and Greece as per EBRD standards
  • Evaluation and comparison of route corridors
  • Gap analyses; adaptation of technical project requirements
  • Cost estimates of overall project
  • Detailed risk analyses of the stations
  • Offshore pipeline design