
Kazakhstan-China-Crude Oil Pipeline Phase II - Kenyak-Kumkol-Section
Project |
| Kazakhstan-China Crude Oil Pipeline Phase II |
Client |
| Kazakhstan-China Pipeline KCP |
Country |
| Kazakhstan |
Time frame |
| 2008 - 2009 |
The first stage of the second Phase of the Kazakhstan-China Pipeline consists of the Kazakh pipeline section between Kenkiyak and Kumkol. The objective of "Kenkiyak-Kumkol" main oil pipeline construction is the possibility of stock oil transportation from the oil fields development in West and Central Kazakhstan to People's Republic of China.
Technical data:
- Pipeline length: 778 km
- Diameter: 32?
- Design capacity: 10 MTA
- Design pressure: 6,4 MPa
- 3 pig trap stations
- 30 block valve stations
- Metering facilities with telecommunication systems and energy supplies
- Head pump station at Kenkiyak and pump station at Kumkol: pig launcher at Kenkiyak and receiver at Kumkol, relief valves units, drainage tanks, custody transfer stations (CTS)
- Shock wave suppression units: field pump, vertical steel tank, surge relief valve
- Combined emergency response station (CERS) site
Services:
- Project management
- Consulting services during construction
