Choose a language

References:             

Reference list (excerpt)

Trans Austria Gasline (TAG Loop II)

Project 

   

Trans Austria Gasline (TAG Loop II)

Client

   

OMV AG

Country

   

Austria

Time frame

   

1998 - 2006

Basic and detail design for the increase of transport capacity for Russian gas from Baumgarten at the Slovak/Austrian border to the Austrian/Italian border. Services included authority engineering and construction supervision.

Technical Data:

  • Purpose: Gas Transportation
  • Length: 380km
  • Dimension:  TAG I: 36"/38", TAG II: 42", TAG Loop II 40”
  • Capacity: 4.3 MNm3/h
  • 3 Compressor Stations (255MW)
  • Type: Turbo Compressor
  • Drive: Gas Turbine
  • Construction of one additional pipeline TAG Loop II of 40”
  • Extension of the compressor stations amongst others with additional filters, gas coolers,  one additional gasturbine  compressor unit and extension of gas dehydration including related facilities