Trans Austria Gasline (TAG Loop II)
Project |
| Trans Austria Gasline (TAG Loop II) |
Client |
| OMV AG |
Country |
| Austria |
Time frame |
| 1998 - 2006 |
Basic and detail design for the increase of transport capacity for Russian gas from Baumgarten at the Slovak/Austrian border to the Austrian/Italian border. Services included authority engineering and construction supervision.
Technical Data:
- Purpose: Gas Transportation
- Length: 380km
- Dimension: TAG I: 36"/38", TAG II: 42", TAG Loop II 40”
- Capacity: 4.3 MNm3/h
- 3 Compressor Stations (255MW)
- Type: Turbo Compressor
- Drive: Gas Turbine
- Construction of one additional pipeline TAG Loop II of 40”
- Extension of the compressor stations amongst others with additional filters, gas coolers, one additional gasturbine compressor unit and extension of gas dehydration including related facilities


