WAG Plus 600

Project 

   

WAG Plus 600

Client

   

OMV AG, Austria

Country

   

Austria

Time frame

   

2005 - 2011

Engineering and management services to increase the capacity of the existing West Austria Gas Pipeline system by 600,000 Nm³/h to 1,800,000 Nm³/h max. capacity by looping and boosting.

Technical Data:

  • Installation of approx. 80 km, 48" loop lines
  • 4 gas turbine driven turbo compressors:
    • (3 x 12MW ISO and 1 x 15MW ISO)
  • 2 electrically driven turbo compressors
    • (2 x 8 MW integrated high-speed electric motor compressor units)
  • 1 gas dehydration facility


Highlights:

  • Quick project handling in the first phase
  • Very detailed environmental impact studies for the loop sections
  • Expansion of existing stations with minimum downtime for tie-ins
  • Extremely quiet compressor station that blends into the rural landscape