Reference list Waste

Project

Client, Country

Technical Data

Waste Treatment for the Voronezh Region

Malibu GmbH, Russia

Materials reclamation and / or thermal recycling facilities, as well as subsequent safe disposal of non-recyclable waste.
850,000 inhabitants, annually generated waste volume amounts to about 1,300,000 m³, which equals some 600,000 tonnes per year

Construction of Solid Waste Recycling and Neutralisation Plant in Kalisz

Zwiazek Komunalny Czyste Miasto, Czysta Gmina, Poland

Plant capacity: 94,000 Mg per year, daily production capacity: 450 Mg

Waste Site for the New Wendlingen - Ulm, High-Speed Railway Line

Deutsche Bahn AG, Germany

New construction of twin-track railway line, Length = approx. 17.1 km, Waste volume = 3 Mio m³

Roppen Landfill

Abfallbeseitigungsverband Westtirol, Austria
 

Construction of a state-of-the art landfill (840,000 m³) for depositing domestic waste of 2 Tyrolean districts in the upper Inn valley (approx. 80,000 inhabitants)

Ochsentanne Waste Site

Seefeld Plateau and Leutaschtal Waste Management Association, Austria

Former domestic waste site, Clean-up of waste site, Waste volume = 300,000 m³

Arlberg Railway Line, St. Jakob - St. Anton, Section Alternative South

Austrian Federal Railways (ÖBB), Austria

New twin-track line to replace the existing single-track line, Length = 6.0 km, Waste volume = 255,000 m³

Wiesing Sewage Sludge Disposal Site

Achental - Inntal - Zillertal Wastewater Management Association, Austria

Disposal site for sewage sludge, Waste volume = 100,000 m³, approx. 5,000 to/a asphalt liner

Waste Site for the New Nuremberg - Ingolstadt, High-Speed Railway Line

Deutsche Bahn AG, Germany

New construction of twin-track railway line, Overall length = 83 km, Tunnel portion = 37 %, Waste volume = 6.4 Mio m³

Graslboden 2 Waste Site

Waste Management Association of Central Tyrol, Austria

Domestic waste site, Waste volume = 1.2 Mio m³, Serviceable life = 20 years

Roppen 1 Waste Site

West Tyrolean Waste Management Association, Austria

Waste site closure measures, Waste volume = 270,000 m³, Residents in waste site catchment area = 80,000, Serviceable life = 19 years

Roppen II Domestic Waste Site

West Tyrolean Waste Management Association, Austria

Waste volume = 800,000 m³, Population in waste site catchment area = 80,000, Serviceable life = 25 years

Bannwald Domestic Waste Site

Municipality of Reutte, Austria

Waste volume = 200,000 m³, Population in waste site catchment area = 25,000, Serviceable life = approx. 30 years

Lavant Old Waste Containment

East Tyrolean Waste Management Association, Austria

Waste volume = 250,000 m³, Determination, collection and disposal of the emissions produced by the existing waste site (gas, leachate).

Graslboden 1 Domestic Waste Site

Waste Management Association, District of Innsbruck, Austria

Waste volume = 420,000 m³, Population in waste site catchment area = 200,000, Serviceable life = approx. 10 years