Reference list Production facilities
Project | Client, Country | Technical Data |
Urengoy Field Development Project | Wintershall AG, Kassel, Germany | Length: 11.5 and 40 km, diameter: 15", design capacity: 2 and 5 MM m³/d, design pressure: 500 bar (gathering), tank farm: 3 x 2,000 m³, 2 metering stations, 4 pigging stations |
Pre- Bid Engineering for OGD III Upstream Project | NPCC - National Petroleum Construction Company, United Arab Emirates | 6 new Remote Manifold Stations (RMS), approx. 260 km of gathering and re-injection lines (6" - 10") and approx. 160 km of trunk lines (10" - 20") including power supply |
Feasibility study for gas field Lubiatow-Miedzychod-Grotow-Sowia Gora (LMG Project) | Polskie Górnictwo Naftowe i Gazownictwo S.A., Poland | 1 treated oil export pumping station, 1 light gas export compressor station |
Conversion of the middle European crude oil pipeline (MERO) to Bidirectional Operation | MERO CR, a.s., Czech Republic and MERO Pipeline GmbH, Germany | length: 348 km (German section: 179 km), diameter: DN 700, 1 pumping station in Vohburg, 1 terminal station in Nelahozeves, 54 block valve stations |
Crude Oil Wellhead Platforms Revamp | Mobil Producing Nigeria Unlimited, Nigeria | 38 wellhead platforms, three, four and six pile supported crude production facilities with three levels, 5 wellhead platforms comprising of wellheads, manifolds, test separators and flow lines |
