ILF Group

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

Publications

collage_HGF_rev3_2018-1
Author
Year
Title
File

F. Diernhofer, C. Sommerlechner, B. Fößleitner

2014

With High-Speed to a safe emergency handling – Vienna-St. Pölten Tunnel High-Speed Line

7th International Conference ‘Tunnel Safety and Ventilation’ 2014, Graz, Seite 20 - 27

B. Kohl, C. Forster, S. Wiesholzer

2014

Upgrading of the Austrian Tunnel Risk Model Turismo – Methodocial and Practical Aspects

7th International Conference ‘Tunnel Safety and Ventilation’ 2014, Graz, Seite 170 - 179

A. Kirsch, T. Marcher

2014

Geologisch-geotechnischer Planungsprozess von Tunnelbauten

Beton-Kalender 2014, Ernst & Sohn GmbH & Co. KG, Seite 39-62, 2014

A. Kirsch, T. Marcher

2014

Geologisch-geotechnischer Planungsprozess von Tunnelbauten

Beton-Kalender 2014, Ernst & Sohn GmbH & Co. KG, Seite 39-62, 2014

O. Pape

2014

Organisatorische Randbedingungen bei der Abwicklung von Projekten mit BIM

IPDC Kongress 2014, Universität Innsbruck - Fakultät für Technische Wissenschaften, Campus Technik, 20.-21. November 2014

R. Große

2014

Speicher mit Großwärmepumpe

ZfK - Zeitschrift für kommunale Wirtschaft, August 2014, Seite 19

A. Feizlmayr

2014

Einige Gedanken zur Energiewende in Deutschland

XX0401-ILFM-AD-0104

Dr. U. Neunert

2014

Using the Linear Risk Integral (LRI) approach in pipeline QRA for a better application of risk mitigation measures

Pipeline Technology Journal, May 2014, Seite 38-45

R. Heissenberger, J. Benedikt, G. Mauerhofer

2014

Tunnel Untersammelsdorf – erweiterte Planungsstrategie für Stützmaßnahmen im „Seeton“

29. Christian Veder Kolloquium Graz, 24.-25. April 2014

B. Kohl, G. Leitner

2014

The early stage of design – key to a successful rail project

10th Forum of Rail Transport, Int. Conf. , 18th – 19th March 2014, Bratislava

D. Galatro, F. Marín-Cordero

2014

Considerations for the dew point calculation in rich natural gas

Journal of Natural Gas Science and Engineering, 18 (2014), Seite 112-119

H. Hoeft

2014

A leading consultant

European Oil and Gas Magazine, Early Edition, Issue 107, Seite 100-101

J. Baer-Pásztory, R. Bergmüller

2013

Public participation in the EU – a comparison between East and West

IAIA13 Conference, May 13-16, 2013, Calgary / Canada (www.iaia.org)

T. Marcher, T. Aydogmus

2013

Some aspects on the design of near surface tunnel – theory and practice

6th Colloquium

U. Burger, T. Marcher, E. Saurer, L. Soldo

2013

A Fault Zone Management for Deep Seated Tunnels

Österreichische Gesellschaft für Geomechanik, Workshop 09.10.2013, Salzburg

D. Ercolani, P. van Eeden

2013

A Method for Prediction of Gas/Gas Ejector Performance

Impiantistica Italiana, Sept./Okt. 2013, Seite 75-80

M. Fink, R. Fritzer, M. Pehm

2013

Atdorf pumped-storage plant: permitting requirements of a large-scale project in Germany

HYDRO Konferenz 2013, Innsbruck/Austria, 7.-9. Oktober 2013(originally published in the HYDRO 2013 Proceedings)

T. Marcher, E. Saurer

2013

Design and verification challenges of hydropower plant caverns

HYDRO Konferenz 2013, Innsbruck/Austria, 7.-9. Oktober 2013(originally published in the HYDRO 2013 Proceedings)

A. Dengg, A. Heel

2013

Kraftwerk Kirchbichl – Erweiterung

Hydro zek, Ausgabe August 2013, Seite 73 - 75

H. Krenn, M. Roner, M. Bauert, H. Wannenmacher

2013

Deformation measurement and long-term behaviour of passively prestressed pressure tunnels through the example of the Niagara Tunnel Facility Project

Geomechanik und Tunnelbau, Heft 5, Seite 398 - 406, 2013
Hello UptimeRobot