Road Tunnel Ventilation Systems

pic_header_road_tunnel_ventilation

Road Tunnel Ventilation Systems

Road tunnel venti­lation systems serve to limit the concen­tration of air pollutants during normal tunnel operation and to transport smoke gases out of the tunnel during self- and assisted rescue in case of fire.

Depending on the tunnel length, the traffic load and type, as well as the likelihood of traffic jams, different venti­lation systems, such as longi­tu­dinal, semi- or fully trans­verse venti­lation systems, are used. A combi­nation of these systems is sometimes required. 

pic_road_tunnels
/

15.5 km Long Road Tunnel in Austria

The safety level of this road tunnel has tremendously increased by the upgrade of the fire life safety equipment to the meet the new national…
more

SR 710 Freeway Tunnel

A twin-tube, double-deck freeway tunnel, approx. 17.8 m (58.5 ft) in diameter and 7.9 km (4.9 mi) in length, was one of four tunnel concepts…
more

A11 Karawanken Motorway – Karawanken Tunnel

The two-lane, two-way Karawanken road tunnel was opened to traffic in 1991. It connects the Austrian A11 Karawanken motorway with the A2 motorway which forms…
more

A02 Motorway – Klagenfurt Northern Bypass

The two tunnels: Falkenberg tunnel and Ehrentalberg tunnel are part of the Klagenfurt Northern Bypass.
more
Get in touch
pic_gertlr

Reinhard Gertl

E-mail
Phone+43 / 512 / 24 12 - 5338

For job applications and job-related questions, please contact jobs@ilf.com or the HR partner named within the job descriptions listed here: https://www.ilf.com/career/jobs/

Get in touch for North America

pic_hans_haring

Hans Haring

E-mail
Phone+1 /231 / 492 - 4134
Mobile+43 / 699 / 145 300 12

For job applications and job-related questions, please contact jobs@ilf.com or the HR partner named within the job descriptions listed here: https://www.ilf.com/career/jobs/

Downloads
thumbnail of Folder_ILF_Tunnel_Equipment_EN_Rev0_Screen

Tunnel Equipment

Hello UptimeRobot