Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

ILF Poland involved in two new Waste to Energy Plant projects

more

ILF Consulting Engineers Polska (ILF Poland) is providing consulting services for two new Waste to Energy Plants located in Poland. The company’s portfolio includes many contracts in this area – both domestic and international. In recent years the company has been involved in investments i.a. in Konin, Poznań and United Arab Emirates (in Sharjah and Dubai). Since 2018 it has also been involved in the construction of the Waste to Energy Plant in Gdańsk and since 2020 in Warsaw.

For the first of the new projects, ILF Poland acts as a technical consultant for the investment preparation phase for the Waste to Energy plant in Poland (100,000 t/a). The company’s services include elaboration of complete design documentation necessary to obtain all administrative decisions and permits for the investment implementation and selection of the EPC Contractor.

The company is responsible for preparation of the basic design, Environmental Impact Assessment as well as application and obtaining of the Decision on Environmental Conditions. The scope of ILF Poland’s duties also includes preparation of the necessary documentation required for an application for connection to the power grid as well as an application for issuing the location conditions for the investment. ILF Poland is also responsible for elaboration of the building permit design and for obtaining a final building permit decision for the investment.

In addition ILF Poland – as a technical consultant – will advise the Client regarding the selection of an EPC Contractor. The company will prepare tender documentation, evaluate the bids and recommend the best one. ILF will also participate in negotiations during the proceedings.

For the second Waste to Energy plant (also 100,000 t/a), ILF Poland acts as a technical and environmental consultant. The company’s services include, among others, verification and analysis of the existing project documentation as well as administrative and environmental decisions obtained during the investment process, including the Environmental Impact Assessment, Decision on Environmental Conditions and Building Permit. The company will also verify existing design documentation, taking into consideration adopted technical solutions. The company will also be responsible for the analysis of the Contractor’s technical offer. In addition, ILF Poland will identify the technical risks when it comes to project execution and estimate  capital expenditures (CAPEX).

itpok-poznan-8
Hello UptimeRobot