Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

Geotechnics and Tunneling: ILF’s part in the Woodsmith Project

more

ILF is proud to be part of the Woodsmith Project – as a design consultant, working for Strabag’s UK branch to deliver the project for their client Anglo American.

The project in the Woodsmith Mine (ENG) comprises a 37-km-long Material Transport System (MTS) tunnel with a diameter of 4.7 m as well as associated caverns and ventilation shafts. Mined polyhalite will be transported through this tunnel, in an environmentally friendly manner, via conveyor belts underneath the North York Moors National Park, directly to the materials handling facility in Wilton for further processing. The polyhalite obtained will be used as fertilizer.

ILF has been providing detailed design services for the “Ladycross” steel lining shaft and the associated secant pile shaft in the same location.
In addition, ILF has carried out a CAT III check of the “Lockwood Beck” steel lining shaft design, parts of the MTS tunnel as well as the primary and secondary lining of the sprayed concrete lining tunnels.

Hello UptimeRobot