Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

Design works for Northern Feeder Line of Brenner Base Tunnel

more

Together with one of ÖBB Infrastruktur AG’s and DB Netz AG’s partners, ILF has been commissioned with a new project as part of the four-track upgrade of the Northern Feeder Line of the Brenner Base Tunnel. This project comprises the route design and project planning works needed for the submission of the environmental impact statement (in Austria) and the conceptual design (in Germany) for the Kirnstein–Schaftenau cross-border section. The approx. 13 km long cross-border Laiming Tunnel is the core element of this upgraded section.

In addition to the Laiming Tunnel, the respective adjacent open-track sections and the associated traffic facilities are also being designed. All of the design services will be carried out using the BIM method and the scope of these design services can also be extended to include the detailed design phase (in Austria) and the basic design phase (in Germany).

Having already been involved in the previous design phases for this section, in particular in the route selection procedure, ILF is pleased to be able to continue working on this complex project in the further design phases.

The section being upgraded forms part of the Northern Feeder Line of the Brenner Base Tunnel, which will be the longest railway tunnel in the world when it is completed. Thus it constitutes an indispensable part of the Scandinavian–Mediterranean Corridor (Scan–Med Corridor) from Stockholm to Naples – the most important North–South railway link in Europe.

 

Railways: Design works for the longest railway tunnel in the world
Hello UptimeRobot