Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

Uetliberg Tunnnel (CH): ILF helps Swissgrid turn up the voltage

more

Swissgrid has commissioned ILF, as part of the engineering consortium KiWa220 (@Suisseplan Bau, @Boess Gruppe), to plan and design the extension of the high-voltage line in the Zurich South area. In order to increase the security of electricity supply to the city of Zurich (CH) and the left side of Lake Zurich, the current line will be upgraded to 220 kilovolts (kV) and connected to the grid in the South.

In the first project section, the cable will be laid underground along the motorway. Subsequently, the cable will be pulled through the conduit blocks already in place in both tubes of the Uetliberg Tunnel. In the third project section, a new 2-km-long energy tunnel, with a diameter of approx. 4 m, will be driven using a tunnel boring machine.

Vorlage NEWS
Hello UptimeRobot