Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

Converting an old coal mine into a renewable energy hub

more

The Glenmuckloch Energy Park (GB-SCT) project entails the conversion of a disused open-cast coal mine into a renewable energy hub. This Energy Park will involve the development of both a 210 MW Pumped Hydroelectric Energy Storage (PHES) plant and a 33.6 MW wind farm on the same site.

During its previous operation, the Glenmuckloch mine was contributing to the greenhouse gas emissions associated with coal-powered energy generation. The envisaged Glenmuckloch Energy Park will serve the purpose of actively reversing these impacts, by contributing to the transition from thermal to renewable energy generation.

The former mining operations at Glenmuckloch created a significant void in the ground, which is to be used as the lower reservoir. Approximately 220 m above the lower reservoir, a new turkey’s nest reservoir will be constructed. The two reservoirs will be connected by an above-ground steel penstock entering a shaft powerhouse located adjacent to the lower reservoir. The PHES will be able to provide approximately 1,600 MWh of renewable energy per cycle.

As part of the decommissioning process for the mine, the entire Glenmuckloch area will need to be rehabilitated. Instead of allowing the mine to become a dormant asset, the conversion of the site into a renewable energy hub will not only provide energy security for the region, but will also help to create jobs for the local communities.

ILF, together with the lead partner Ove Arup & Partners Limited (Arup), has been appointed as the Owner’s Engineer for the development of this project. Arup will oversee the full development of the wind farm project components, while ILF has been engaged as a specialist sub-consultant to oversee the development of the PHES project components. The project is being financed by the Foresight Group (Foresight), a sustainability-led alternative assets and SME investment manager.

Hello UptimeRobot