Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

Improving sustainability in world’s largest undersea road tunnel

more

In Norway, the Norwegian Public Road Administration, Statens Vegvesen, is currently building the E39 Rogfast Project. This project, located North of Stavanger, involves the construction of the twin-tube Boknafjord Tunnel, which, when complete, will be the longest and deepest undersea road tunnel in the world being 26.7 km long and 390 m below sea level at its deepest point.

In addition, the Rogfast Project has been selected by Statens Vegvesen as a pilot project to help reach their CO2 targets through the use of electric-powered heavy construction machinery. Statens Vegvesen has commissioned a consortium consisting of ILF Consulting Engineers in Norway, ILF Consulting Engineers in Austria, Graz University of Technology (Austria) and Sovik Consulting (Norway) to carry out a risk assessment for the use of electric-powered vehicles, commonly referred to as Battery Electric Vehicles (BEV s), in the E39 Rogfast Project.

The aim of this study is primarily to investigate potential fire risks associated with the use of battery-powered heavy vehicles for the transportation of excavated rock.
These fire hazards could arise, for example, from overloading during heavy use or from recharging the vehicles. The impact of these vehicles on the construction process and their practical implementation will also be investigated.
With delivery of this service, the consortium is making a targeted contribution to one of the largest tunnel projects ever to be built in Norway and to the sustainability of tunnelling in general.

Source: Statens Vegvesen
Hello UptimeRobot