Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

Water Transmission System from Shuqaiq to Jizan (KSA)

more

The Shuqaiq–Jizan Water Transmission System Phase 4 is already having a significant impact in the Jizan region in Southwest Saudi Arabia, even before it becomes operational. This project is set to enhance the water supply infrastructure in the region, addressing a pressing need for a reliable and efficient water transmission system.
The planned Shuqaiq–Jizan Water Transmission System Phase 4 encompasses an extensive area and aims to deliver an astonishing 600,000 m3  of potable water per day from Shuqaiq to the governorates of the Jizan region.
The backbone of the water transmission system is a colossal network of high-quality steel pipelines stretching over 523 km. These pipelines have been carefully designed to withstand the region’s unique environmental conditions and to deliver water efficiently and reliably.
Eleven pumping stations shall be strategically located along the transmission route to ensure that water can be efficiently transported across varying terrains and elevations. Each station will be equipped with state-of-the-art technology to optimize water flow and pressure.
The project includes a network of 77 strategically positioned reservoirs, which shall ensure the consistent availability of water throughout the region. These reservoirs will act as storage and distribution hubs, reducing the risk of water shortages and enhancing overall supply reliability.
18 operational reservoirs will help balance water supply and demand, ensuring a stable and consistent flow of water to consumers.
12 specialized water tanker filling stations shall allow for the efficient refilling of water tankers to supply remote areas in the region. This is especially crucial in areas where direct access to pipelines is limited.
As part of the project’s integration with existing infrastructure, eight tie-in stations will be established to connect to and enhance the functionality of existing reservoirs. This approach not only optimizes resources ,but will also improve the overall water distribution system.
A network of tap-off and cross-over stations shall furthermore ensure that water can be efficiently distributed to various communities, industries and institutions. These stations will facilitate access to water at a local level as well.

The Shuqaiq–Jizan Water Transmission System Phase 4 is a remarkable engineering feat and its realization will be a significant milestone in the development of the Jizan region. With its extensive network of steel pipelines, strategically located pumping stations, and multitude of reservoirs and distribution points, this project is poised to revolutionize the region’s water supply infrastructure, addressing essential water transmission needs for years to come.

Hello UptimeRobot