Electrifying Georgia
moreIn September 2018, the Austrian Georgian Development LLC commissioned ILF Consulting Engineers to carry out the construction supervision services for the Lakhami 1 and Lakhami 2 hydropower plants.
The project comprises the hydropower development of the Lakhami River, which has its source at over 3,000 m a.s.l. and originates from the eastern slope of the Kodori Ridge, before it enters the Nenskra River. The Lakhami Upper and Lower hydropower plants are planned on the Lakhami River, north of the Town of Khaisi, in the Svaneti Region in Georgia, at the foot of the Greater Caucasus mountain range.
The Lakhami 1 hydropower plant will have a design capacity of 6.4 MW and the Lakhami 2 hydropower plant a design capacity of 9.5 MW. They will be implemented as a cascade. Both plants are designed as diversion hydropower schemes with buried pipe waterways.