Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

Launch of largest TBM in Switzerland

more

The official TBM launch ceremony took place in February 2016 and marked the start of the construction of the 3.2 km long Belchen rehabilitation tunnel. ILF Consulting Engineers has been entrusted with the construction supervision of the tunnel and, together with partners, also with its design.

With a diameter of 14 m, a length of 75 m and a weight of 2,000 tons, the TBM is currently the largest of its kind in Switzerland. In the next one and half years, the TBM will advance through geologically demanding zones of the Swiss Jura mountain range and will be driven through the mountain at distance of 40-116 m to the existing tunnel system and parallel to it. Subsequently the final lining is also to be constructed.
periactin no rx, lioresal online.
At the end of the construction works in 2022 the two existing tubes of the Belchen tunnel dating from the 1970s are to be rehabilitated as well.

Konrad Blank, Dr. Michael Hertweck, Dr. Martin Herrenknecht, Sebastian Böheim, Olivier Balmer (Marti Managing Director TUAG) and Dr. Markus Schwalt
Hello UptimeRobot