Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

ILF is awarded a contract for an additional gas turbine compressor unit in the Scharenstetten compressor station

more

At the end of 2015 ILF Consulting Engineers was commissioned by terranets bw Gmbh to provide construction design, construction supervision and start-up services for an additional gas turbine compressor unit in the Scharenstetten compressor station.

In the framework of the gas network development plan, the Baden-WA?rttemberg transmission system operator terranets bw GmbH will expand the station in existence since 1988 by adding a fourth compressor to the three machine units currently in operation. The works include, in addition to the erection of machine unit 4, a Solar Taurus 60Ai?? (approx. 350,000 mA?/h), the construction of a new compressor building and an electrical building. Besides various tie-ins to the station piping, the facility will also be equipped with a ground flare system, two new gas coolers and auxiliaries. Start-up is scheduled for Q1/2017.

Hello UptimeRobot