ILF Group

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

ILF wins contract for optimisation of the Austrian section of the Brenner Base Tunnel

more

ILF Consulting Engineers was commissioned by Brenner Basistunnel BBT SE (BBT) to develop different optimisation measures for the Austrian section of the Brenner Base Tunnel (approx. 30 km). The services encompass optimisation measures with regard to logistics, configuration of structures and M&E systems, design of above- and underground auxiliary structures incl. mechanical equipment as well structural analyses for underground structures, pits, retaining structures and buildings. The project also includes assisting the client with the M&E design.
ILF has been working successfully on the Brenner Base Tunnel for many years; with an overall length of about 60 km it is one of the longest railway tunnels in the world.

Hello UptimeRobot