Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

ILF’s involvement in four-track upgrade of Western railway line

more

ILF Consulting Engineers was recently commissioned by ÖBB Infrastruktur AG to provide planning and design input for the four-track upgrade of the western railway line for the Linz-Marchtrenk and Marchtrenk-Wels sections.

The upgrade of these sections makes it possible to increase the line capacity and is an important step in the four-track upgrade of the railway line between Vienna and Wels that forms part of the trans-European network for rail and intermodal transport.

The project is implemented step by step and started with the works for the section “Linz Main Station west site” in the autumn of 2018. The permitting processes for Linz–Marchtrenk (length approx. 15.7 km) and Marchtrenk–Wels (length approx. 6.4 km) are currently underway. Maximum speeds of up to 230 km/h shall be possible in both line sections. A speed of up to 160 km/h is planned for regional rail transport.

ILF has been entrusted with executing the detailed design in the planning phase of the project implementation of both sections.

collage_HGF_rev3_2018_breitbild
Hello UptimeRobot