Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

ILF ventures into Uganda’s water infrastructure market

more

The National Water & Sewerage Corporation (NWSC) commissioned ILF Consulting Engineers and its international partner for the “Kagera Water Works” project in Uganda. Being the first and largest of many packages which will make up the umbrella project “Development of Water and Sanitation Infrastructure for the Mbarara & Masaka Areas”, this project will be financed by the French Agency for Development (AFD).

The overall objective of the project is to secure and improve the supply of drinking water as well as the sanitation infrastructure in Mbarara, Masaka and their surroundings. Package 1 comprises the development of the Kagera water supply system, which includes an intake from the Kagera River – Upper White Nile – (capacity: 8m³/s), the Kagera drinking water treatment plant (first phase capacity: 18,000 m³/d) and the main 58-km-long transmission pipe to Mbarara.

ILF and its partner have been awarded this contract to perform design, tendering and works supervision services for this vital water supply project.

news_uganda_mbarara_masaka
Hello UptimeRobot