Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

It’s all new – the Obervellach II hydropower plant

more

Together with partners, ILF Consulting Engineers was in charge of the site supervision and contract management for the new construction of the Obervellach II hydropower plant as commissioned by ÖBB Infrastruktur AG. This hydropower plant replaces the two existing power plants – Lassach (built in 1905) and Obervellach I (built in 1929) in Carinthia/Austria – they will be decommissioned and partly dismantled.

The planned new hydropower plant will provide traction power (16.7 Hz) and will have a capacity of 38 MW and consist of three water intake structures, an approx. 3.9 km long headrace tunnel and an approx. 0.6 km long storage tunnel with a storage volume of some 60,000 m3. Furthermore, the overall project includes an approx. 1.5 km long pressure pipeline (d = 1.8m) and a power house with two machine units and an approx. 2 km long pressure pipeline (d=0.7 m) including a small hydropower plant (50 Hz) as well as further facilities.

news_obervellach
Hello UptimeRobot