Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

A revolution in reporting

more

On account of the growing complexity of day-to-day project work, the demands on reporting are increasing significantly. Due to the lack of automated processes, classic reporting is prone to errors, only partially up to date and time consuming as well.

By implementing analytical software solutions such as MS Power BI, the great potential of information management can also be used for reporting. The aim is to visualize project-specific data both quantitatively and qualitatively, and in a structured and descriptive manner. These project cockpits are used for quality assurance and also for project coordination and control.
For the project, 2. S-Bahn-Stammstrecke München (2nd Munich S-Bahn Main Line), the Client, Deutsche Bahn, requested quality assurance for BIM in the design phase for various disciplines. In the course of the general BIM coordination, ILF Consulting Engineers developed the quality assurance process by means of MS Power BI. In a multi-stage procedure, the quality of the individual technical models was evaluated and presented in a report. After the client’s approval, a uniform workflow, an interdisciplinary template and a project-specific user guide were developed.

For the project, this constitutes a new standard of quality assurance, which has been implemented for the first time with such professionalism and which will be a yardstick for future projects.

2020-11_BIM_QM_Reporting_web
Hello UptimeRobot