Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

Publications

collage_HGF_rev3_2018-1
Author
Year
Title
File

M. Rieder, T. Schulze

2007

Nachweis der Integrität bestehender Pipelinesysteme im Zuge der Neuerteilung der Betriebsgenehmigung

3R International, Heft 1-2/2007, Seite 48-52

R. Pöttler, H. F. Schweiger, G. Peschl

2007

Geohazards – Cost Hazards A new method for evaluation of risks in underground structures

ECI Conference

K. Botschek, B. Kohl, R. Hörhan

2007

Austrian Risk Analysis for Road Tunnels – Development of a New Method for the Risk Assessment of Road Tunnels

International Conference

C. Neumann, F. Diernhofer, G. Harer, J. Koinig

2007

Koralm Tunnel – Development of Tunnel System Design and Safety Concept

International Conference

C. Neumann, C. Sommerlechner

2007

Wie passen Tunnelsicherheitsmaßnahmen zu den Rahmenbedingungen der Eisenbahn?

ÖGG - Fachseminar, Seite 1-6, 2007

M. Rieder, T. Schulze

2007

Verification of the integrity of existing pipeline systems

3R International, Special 1/2007, Seite 44-58

B. Kohl

2007

Risk Analyses for Road Tunnels – Light at the end of the tunnel?

Eurotransport, Heft 4, Seite 35-40, 2007

R. Pöttler, A. Spiegl

2007

Bestimmung des Einflusses von Karststrukturen auf die dauerhafte Stand- und Betriebssicherheit von Verkehrstunneln durch 3D-Finite-Element-Modellierung

Bautechnik, Heft 2, Seite 103-112, 2007

R. Pöttler, H. F. Schweiger, G. M. Peschl

2007

Application of the random set finite element method for analysing tunnel excavation

Georisk, Heft 1, Seite 43-56, 2007

W. Widmann

2006

Reuse of municipal wastewater using Tehran as an Example

Arab Water World, Heft 5, Seite 50-52, 2006

L. Bangert

2006

Engineering new limits for large gas transportation systems

3R International, Special 1/2007, Seite 44-58

R. Pöttler, H. F. Schweiger

2006

Anwendung der Random-Set-Methode (RSM) für Standsicherheitsuntersuchungen im Tunnelbau

Bautechnik, Heft 11, Seite 754-759, 2006

B. Kohl, K. Botschek, R. Hörhan

2006

Austrian Risk Analysis for Road Tunnels – Development of a new Method for the Risk Assessment of Road Tunnels

3rd International Conference

C. Neumann, C. Sommerlechner, R. Valo

2006

Emergency Exercises in Austrian Railway Tunnels

3rd International Conference

S. Eder, G. Poscher, C. Prager

2006

Risk Analyses and Risk Management – Slope Instabilities in Alpine Environments

ECI Conference on Geohazards (Lillehammer), paper 15, 2006

T. Callan

2006

Pipeline Integrity Management – The key to safe operation

The Australian Pipeliner, Heft 10, Seite 54-55, 2006

R. Pöttler, H. F. Schweiger

2006

Cost Evaluation for Traffic and Transport Infrastructure Projects Taking Account of Project Risks

ECI Conference on Geohazards (Lillehammer), paper 30, 2006

R. Pöttler, F. Starjakob, D. Spöndlin

2006

Strenger Tunnel: Tunnelbau in stark druckhaftem Gebirge / Strenger Tunnel: Tunnelling in highly squeezing Rock

Tunnel, Heft 5, Seite 58-65, 2006

K. Schmid

2006

The new bridge for the Hungerburg – Funicula-Railway – On the Way to the Top

International Conference of Bridges (Croatia), Seite 127-134, 2006

A. Speckl

2006

Erweiterung der Schneeanlage Ahorn

Mountain Manager, Heft 3, Seite 53, 2006
Hello UptimeRobot