Publications

collage_business_areas_website_neu
Author
Year
Title
File

B. Kohl, G. Leitner

2014

The early stage of design – key to a successful rail project

10th Forum of Rail Transport, Int. Conf. , 18th – 19th March 2014, Bratislava

D. Galatro, F. Marín-Cordero

2014

Considerations for the dew point calculation in rich natural gas

Journal of Natural Gas Science and Engineering, 18 (2014), Seite 112-119

H. Hoeft

2014

A leading consultant

European Oil and Gas Magazine, Early Edition, Issue 107, Seite 100-101

T. Marcher, T. Aydogmus

2013

Some aspects on the design of near surface tunnel – theory and practice

6th Colloquium "Rock Mechanics - Theory and Practice", Seite 179-188, 2013, Vienna

U. Burger, T. Marcher, E. Saurer, L. Soldo

2013

A Fault Zone Management for Deep Seated Tunnels

Österreichische Gesellschaft für Geomechanik, Workshop 09.10.2013, Salzburg

D. Ercolani, P. van Eeden

2013

A Method for Prediction of Gas/Gas Ejector Performance

Impiantistica Italiana, Sept./Okt. 2013, Seite 75-80

M. Fink, R. Fritzer, M. Pehm

2013

Atdorf pumped-storage plant: permitting requirements of a large-scale project in Germany

HYDRO Konferenz 2013, Innsbruck/Austria, 7.-9. Oktober 2013 (originally published in the HYDRO 2013 Proceedings)

T. Marcher, E. Saurer

2013

Design and verification challenges of hydropower plant caverns

HYDRO Konferenz 2013, Innsbruck/Austria, 7.-9. Oktober 2013 (originally published in the HYDRO 2013 Proceedings)

A. Dengg, A. Heel

2013

Kraftwerk Kirchbichl – Erweiterung

Hydro zek, Ausgabe August 2013, Seite 73 - 75

H. Krenn, M. Roner, M. Bauert, H. Wannenmacher

2013

Deformation measurement and long-term behaviour of passively prestressed pressure tunnels through the example of the Niagara Tunnel Facility Project

Geomechanik und Tunnelbau, Heft 5, Seite 398 - 406, 2013

H. Krenn, M. Roner, M. Bauert, H. Wannenmacher

2013

Deformation measurement and long-term behaviour of passively prestressed pressure tunnels through the example of the Niagara Tunnel Facility Project

Geomechanik und Tunnelbau, Heft 5, Seite 398 - 406, 2013

M. Serafin, W.van Appeldorn

2013

Kläranlage Czajka in Warschau fertiggestellt

wasserwirtschaft wassertechnik, Ausgabe 4/2013, Seite 16 - 19, www.wwt-online.de

E. Saurer, T. Marcher, M. John

2013

Decisive design basis and parameters for power plant caverns

ITA-AITES World Tunnel Congress, WTC 2013, Geneva

T. Marcher, M. John, J.-M. Hohberg, D. Fellner, K. Blank, R. Marclay

2013

Design and verification challenges of the Limmern caverns

ITA-AITES World Tunnel Congress, WTC 2013, Geneva

C. Volderauer, R. Galler, T. Marcher

2013

Gotthard Base Tunnel – 3-dimensional numerical calculations for part of the Clavaniev Zone considering geotechnical measurement data

ITA-AITES World Tunnel Congress, WTC 2013, Geneva

U. Grunicke, M. Ristic, D.F. Wood

2013

Overcoming Rock Squeeze and Overbreak in a large Diameter TBM Excavation

ITA-AITES World Tunnel Congress, WTC 2013, Geneva

B. Kohl

2013

Trassenauswahl im Spannungsfeld der Interessen

Festschrift Technische Universität Wien, 2013

B. Lässer

2013

A dense pipeline network guarantees our energy supply

Herrenknecht Magazin, Seite 24 - 25, 2013

B. Kohl

2013

Safety in road tunnels – state of the art

12th International Conference "Underground Construction Prague 2013", 2013

M. Beisler, H. Klapperich, D. Jacob, H. Schweiger

2013

Modelling of input data uncertainty for the financial evaluation of complex infrastructure projects

Bauingenieur, Ausgabe 2, Seite 78-88, 2013