Choose your Country

Australia

Austria

Canada

Chile

Czechia

France

Georgia

Germany

Iraq

Jordan

Kazakhstan

Laos/ປະເທດລາວ

Nigeria

Norway

Pakistan

Peru

Poland

Romania

Saudi-Arabia

Spain

Switzerland

Thailand

United Arab Emirates

United Kingdom

Uzbekistan

News

collage_HGF_rev3_2018-1

ILF at HYDRO 2016 in Montreux

more

ILF Consulting Engineers will participate at ai???HYDRO 2016ai??? in Montreux, Switzerland from 10 to 12 October 2016. Reinhard Fritzer will present ai???Highlights of the initial project stages of the Koralm pumped-storage plant in Austriaai??? during session 13a: On-going pumped-storage projects in Europe.
He will be pleased to receive your questions or feedback. Please let us know how we can help you tackle your challenges (reinhard.fritzer@ilf.com).
For further information please go to the website http://www.hydropower-dams.com/hydro-2016.php?c_id=88

ILF at “HYDRO 2016” in Montreux

ILF involved in PDH propylene production plant in Police

more

ILF Consulting Engineers was contracted by PDH Polska (Grupa Azoty) to supervise the construction of the Grupa Azoty Police flagship investment scheme, which is the PDH propylene production plant in north-western Poland. A liquid chemicals terminal in Police harbour will be developed as part of this project.

The PDH propylene production plant is a highly complex technical installation with investment costs of at least 0.4 billion euros. Some 1,000 people will be working at the construction site at the culmination of the project realisation and about 200 people will be working at the plant after commissioning. The first ton of propylene will be produced in the second half of 2019.
ILFai??i??s scope of services includes review of FEED documentation, project management, construction supervision, procurement support, commissioning and start-up support.

ILF wins Austrian Export Prize 2016

more

Once a year, the Austrian Chamber of Commerce rewards outstanding achievements in the export sector.
On 1 June 2016 in the presence of high-ranking representatives from politics and business (including Dr. Reinhold Mitterlehner ai??i?? Vice Chancellor and Federal Minister of Science, Research and Economy, Sebastian Kurz ai??i?? Federal Minister for Europe, Integration and Foreign Affairs and Dr. Christoph Leitl ai??i?? President of the Austrian Chamber of Commerce), ILF Consulting Engineers received the Export Prize (gold award) in the category information and consulting for successfully developing the market in South East Asia.

From left to right Präs. Leitl, Robert Bodenstein, Matthias Beisler und Alexander Speckle (ILF), Minister Mitterlehner, WD Scherz; Picture: Aussenwirtschaft Austria

ILF is awarded a contract for a new sewage treatment plant in the United Arab Emirates

more

In June 2016, ILF Consulting Engineers signed a contract with one of the major developers of UAE, Nakheel.

The new sewage treatment plant for Dubaiai??i??s Deira Islands will be developed in two stages and is designed for a capacity of 20,000 mA?/d in the first phase (2017ai??i??2022) and 37,000 mA?/d in the second phase (2022ai??i??2042).

ILF will carry out Ownerai??i??s Engineering services for the construction of the new sewage treatment plant.

Gotthard Base Tunnel: The longest railway tunnel in the world enters into operation

more

After a construction period of some 17 years the 57 km long Gotthard Base Tunnel will open for partial commercial service. The tunnel was officially opened on 1 June 2016 with numerous personalities from Switzerland and abroad attending the ceremony. The completion of the imposing structure was celebrated for several days.

Responsibility for the longest railway tunnel in the world was handed over to SBB in late May. The coming months comprise the last commissioning phase which, together with partial commercial service (freight trains), will end when the timetable is changed in December 2016.
Since the start in 1995 (permit application phase), ILF Consulting Engineers has been entrusted with reviewing all the structural components relevant for serviceability and load-bearing capacity and has been participating in several working groups and expert teams under difficult conditions.
We would like to thank all involved parties for their work and congratulate them on this success!

Gotthard Base Tunnel: The longest railway tunnel in the world enters into operation

ILF at the 11th Pipeline Technology Conference in Berlin

more

ILF will participate in Pipeline Technology Conference with presentations and its own stand.

We are very pleased to welcome you at our booth no. 39+40 in ai???Estrel Convention Centerai???, Berlin/Germany from 23th May to 25th May 2016.
For further information please visit the website www.pipeline-conference.com

ILF at the 11th Pipeline Technology Conference in Berlin

ILF at the IRAN Oil Show in Tehran ai??i?? Iran

more

ILF will participate in the ai???Iran Oil Show Exhibitionai???.

We are very pleased to welcome you at our booth (Nr. 1473), Hall no. 40-A in ai???Tehran IntA?l Permanent Fair Groundai???, Tehran/Iran from 5th May to 8th May 2016.

For further information please visit the website: http://iran-oilshow.ir/English/

ILF at the IRAN Oil Show in Tehran – Iran

ILF at Mountain Planet 2016 in Grenoble

more

ILF Consulting Engineers will be represented at the International Mountain Development Fair in Grenoble, France from 13 to 15 April 2016.
We look forward to welcoming you to our stand (B90). For further information please go to the website http://www.mountain-planet.com/index-en.html

ILF at Mountain Planet 2016 in Grenoble

ILF designs the Port Said Railway Tunnel in Egypt

more

ILF Consulting Engineers is responsible for the design of the Port Said railway tunnel in Egypt. The 5.6 km long tunnel will underpass the Suez canal, connecting the mainland with the Sinai peninsula approximately 25 km south of Port Said city. The tunnel will be advanced in the extremely unfavourable soils of the Nile delta.

The design shall meet EU standards and comprises the alignment of the railway line with stations, geological analyses, the development of a tunnel system and a tunnel safety concept, the design of the tunnel structures including geotechnical and structural aspects as well as the design of the electrical and electro-mechanical systems. The design process shall include the development and delivery of preliminary, conceptual and construction design.
buy periactin online cheap, acquire dapoxetine.

ILF to provide Feasibility Study for Rehabilitation of Main Line 2 of Pakistan Railways

more

In February 2016, Pakistan Railways commissioned ILF Consulting Engineers to carry out a feasibility study for the rehabilitation of the existing 1,343 km long broad gauge (1,676 mm) Main Line 2 from Kotri station to Attock City station. The goal of this contract is to determine the existing conditions of the infrastructure and to identify improvements required to increase the travelling speed from currently 70 ai??i?? 80 kmph to up to 160 kmph.
.
The services comprise a condition survey of more than 2,000 bridges with non-destructive testing and a structural analysis of 100 selected representative bridges, 10 tunnels, stations and freight yards. Topographic surveys, geological studies and geotechnical investigations, hydrological studies, rehabilitation studies for all infrastructure components, including rail systems, power, signaling and telecom systems and infrastructure crossings will also be carried out. Based on traffic studies, operation studies and cost estimates, a financial and economic study shall complete the feasibility study report.

Milestone reached in Filder tunnel, Stuttgart 21

more

The tunnel boring machine driving the 9.5 km long Filder tunnel as part of the Stuttgart 21 project has successfully completed its first drive. ILF Consulting Engineers is responsible for the site supervision of this railway tunnel project.

ILF at Hydro Asia 2016 in Vientiane

more

ILF Consulting Engineers will be represented at the Sixth International Conference on Water Resources and Hydropower Development in Asia in Vientiane, Laos from 1 to 3 March 2016.
We look forward to welcoming you to our stand (085). For further information please go to the website http://www.hydropower-dams.com/ASIA%202016.php?c_id=303

ILF at Hydro Asia 2016 in Vientiane

Launch of largest TBM in Switzerland

more

The official TBM launch ceremony took place in February 2016 and marked the start of the construction of the 3.2 km long Belchen rehabilitation tunnel. ILF Consulting Engineers has been entrusted with the construction supervision of the tunnel and, together with partners, also with its design.

With a diameter of 14 m, a length of 75 m and a weight of 2,000 tons, the TBM is currently the largest of its kind in Switzerland. In the next one and half years, the TBM will advance through geologically demanding zones of the Swiss Jura mountain range and will be driven through the mountain at distance of 40-116 m to the existing tunnel system and parallel to it. Subsequently the final lining is also to be constructed.
periactin no rx, lioresal online.
At the end of the construction works in 2022 the two existing tubes of the Belchen tunnel dating from the 1970s are to be rehabilitated as well.

Konrad Blank, Dr. Michael Hertweck, Dr. Martin Herrenknecht, Sebastian Böheim, Olivier Balmer (Marti Managing Director TUAG) and Dr. Markus Schwalt

ILF Consulting Engineers collects Green Points by travelling by rail

more

To further raise peopleai??i??s awareness of how they can help the environment by switching to travelling by rail, the Austrian Federal Railways (Ai??BB) have recently initiated the environmental programme Ai??STERREICH BLA?HT AUF (AUSTRIA IS BLOSSOMING). In the framework of this initiative, for every kilometer travelled by rail the Ai??BB offers ai???Green Pointsai??? that can be collected and used to promote specific environmental projects.

By travelling by rail when on business trips ILF has saved more than 15.25 tonnes in CO2 emissions in one year and was able to support the project ai???Paradies fA?r Amphibien (Paradise for amphibians)ai??? with the 97,734 Green Points that ILF employees collected from the Ai??BB.

As the sustainable protection of the environment is of utmost importance for our company both with regard to the structures and facilities designed by ILF and with regard to our daily project work, we appreciate this initiative and see it as a motivation to further increase our efforts in this respect.

ILF Consulting Engineers collects Green Points by travelling by rail

ILF to attend the ai???4th -Annual Advanced Hydropower Generation and Pumped Storage Forumai??? in Berlin

more

ILF Consulting Engineers will participate in the ai???4th Annual Advanced Hydropower Generation and Pumped Storage Forumai??? to be held in Berlin, Germany, from 27 to 28 January 2016. The topic of the internationally recognized hydropower conference is ai???Exploit the Full Potential of Hydropower through Understanding its Role in the New Energy Worldai???. .

ILF will be represented by Dr. Ralph BergmA?ller, who will give a presentation on ai???Optimized Permitting Procedures for Pumped Storage Plantsai??? (28 January, at 9:10 a.m.).

We look forward to lively discussions. For further information please go to the website http://www.bisgrp.com/portfolio/conferences/energy/4th-annual-advanced-hydropower-generation-and-pumped-storage-forum

ILF to attend the “4th -Annual Advanced Hydropower Generation and Pumped Storage Forum” in Berlin

ILF is awarded a contract for an additional gas turbine compressor unit in the Scharenstetten compressor station

more

At the end of 2015 ILF Consulting Engineers was commissioned by terranets bw Gmbh to provide construction design, construction supervision and start-up services for an additional gas turbine compressor unit in the Scharenstetten compressor station.

In the framework of the gas network development plan, the Baden-WA?rttemberg transmission system operator terranets bw GmbH will expand the station in existence since 1988 by adding a fourth compressor to the three machine units currently in operation. The works include, in addition to the erection of machine unit 4, a Solar Taurus 60Ai?? (approx. 350,000 mA?/h), the construction of a new compressor building and an electrical building. Besides various tie-ins to the station piping, the facility will also be equipped with a ground flare system, two new gas coolers and auxiliaries. Start-up is scheduled for Q1/2017.

Season’s greetings and best wishes for 2016

more

With the year 2015 rapidly drawing to a close, we feel a deep sense of gratitude. We therefore convey our thanks to our esteemed clients and business partners.

We wish you a relaxing and peaceful holiday season and all the best for 2016. May the New Year bring you health, happiness and prosperity.

TECON to study energy alternatives for generation of EOR Steam Flooding

more

TECON Engineering (a company of the ILF-Group) has been awarded a contract for the ai???Study for Energy Alternatives for Steam Generation for EOR purposesai??? by Mansarovar Energy, a Colombian O&G operator which is a JV between SINOPEC and ONGC Videsh.

Mansarovar operates the NARE Block in Middle Magdalena region, with a total production of 40 kbpd of heavy oil. For this operation Mansarovar injects steam in the oil reservoirs- The steam is produced by several steam generators distributed throughout the whole block, and the fuel supply for these generators requires an in-depth implementation study. TECON will develop a comprehensive study for all the industrial energy sources available in Colombia, including CST (Concentrated Solar Thermal) which can provide suitable energy supply for the steam generators. In addition, using a renewable source of energy for EOR production is an unparalleled pioneering technology to date.

ILF appointed to provide design services for alignment selection for northern approach route to Brenner base tunnel

more

In November 2015, ILF Consulting Engineers (togehter with SchA?AYler-Plan Ingenieurgesellschaft mbH and Baader Konzept GmbH) with was assigned by Ai??BB Infrastruktur and DB Netz AG with developing a recommendation for a cross-border alignment, finding the optimum solution for a third and fourth track (new railway line) for the approach route to the Brenner base tunnel.

In the southern section of the northern approach route, the design area includes the future route from ai???Schaftenauai??? junction in the Tyrol to the new ai???Deutsches Inntalai??? junction, south of Rosenheim. North and east of the new ai???Deutsches Inntalai??? junction, potential connections with the existing railway network of DB AG heading to Munich, MA?hldorf and Salzburg are to be investigated.

ILF appointed for largest PV solar project in the MENA region

more

In November 2015 ILF Consulting Engineers has been awarded the ownerai??i??s engineer contract (OE) for the 200 MW photovoltaic (PV) power plant Shuaa 1 which will be phase 2 of the Sheikh Mohammed bin Rashid al Maktoum solar park. The power purchase agreement (PPA) for the project between Dubai Electricity & Water Authority (DEWA) and a consortium led by ACWA Power was already signed in March.
With the recent contract award by the project company Shuaa Energy ILF continues its successful involvement as a leading engineering consultant for solar power and desert environments.  Already during phase 1 of the development of Dubaiai??i??s solar program ILF has provided the OE services for  DEWAai??i??s 13 MW PV pilot project.

Hello UptimeRobot